NCC 2022 Volume One - Building Code of Australia Class 2 to 9 buildings
Search the National Construction Code editions
G3
Part G3 Atrium constructionPart G3 Atrium construction
This Part provides additional Deemed-to-Satisfy Provisions for buildings that contain an atrium. The Deemed-to-Satisfy Provisions of this Part cover atrium well dimensions, construction, fire separation, exits and fire and smoke control systems.
Deemed-to-Satisfy Provisions
G3D1
Application of Part
2019: G3.1
This Part does not apply to an atrium which—
G3D2
Dimensions of atrium well
2019: G3.2
An atrium well must have a width throughout the well that is able to contain a cylinder having a horizontal diameter of not less than 6 m.
G3D3
Separation of atrium by bounding walls
2019: G3.3
An atrium must be separated from the remainder of the building at each storey by bounding walls set back not more than 3.5 m from the perimeter of the atrium well except in the case of the walls at not more than 3 consecutive storeys if—
G3D4
Construction of bounding walls
2019: G3.4
Bounding walls must—
G3D5
Construction at balconies
2019: G3.5
If a bounding wall separating an atrium from the remainder of the building is set back from the perimeter of the atrium well, a barrier that is imperforate, non-combustible, and not less than 1 m high, must be provided.
G3D6
Separation at roof
2019: G3.6
In an atrium—
G3D8
Fire and smoke control systems
2019: G3.8
Sprinkler systems, smoke control systems, fire detection and alarm systems, and emergency warning and intercom systems must be installed in compliance with Specification 31.