NCC 2022 Volume Three - Plumbing Code of Australia
Search the National Construction Code editions
E4
VIC Part E4 Stormwater - Surface and sub-surface drainage systemsVIC Part E4 Stormwater - Surface and sub-surface drainage systems
This Part sets out the requirements for the design, construction, installation, replacement, repair, alteration and maintenance of any part of a surface drainage system to the point of connection.
Objectives
VIC E4O1 Objective
2019: FO2
The Objective of this Part is to—
Objective
Functional Statements
VIC E4F1 Functional statement
2019: FF2.1
Buildings and their surroundings are to be provided with a surface drainage and subsurface drainage installation and be constructed in such a manner as to provide protection for people, property and the environment from the adverse effects of stormwater.
Functional statement
Performance Requirements
VIC E4P1 Surface drainage systems
2019: FP2.1
Surface drainage systems
VIC E4P2 Design, construction and installation
2019: FP2.2
Design, construction and installation
Deemed-to-Satisfy Provisions
VIC E4D1 Application
2019: F2D1
Performance Requirements E4P1 to E4P2 are satisfied by complying with E4D2.
Application
VIC E4D2 General requirements
2019: F2D2
The design, construction, installation, replacement, repair, alteration and maintenance of surface and subsurface drainage systems must be in accordance with AS/NZS 3500.3.
General requirements