NCC 2019 Volume Two Amendment 1
Search the National Construction Code editions
Appropriate Performance Requirements
Where an alternative termite management system is proposed as a Performance Solution to that described in Part 3.1.4, that proposal must comply with—
Compliance with this acceptable construction practice satisfies Performance Requirement P2.1.1 for termite risk management.
The intent of these requirements is to provide for a termite management system that deters termites from gaining entry to a building via a concealed route. The installation of a termite management system will not stop termite activity from occurring on the site.
State and Territory Variations
In Queensland delete 3.1.4.1 and replace with the following:
3.1.4.1 Application
Compliance with this acceptable construction practice satisfies Performance Requirements P2.1.1 and QLD P2.1.3.
The requirements of this Part apply where:
a Class 1 or 10 building is constructed in an area where subterranean termites are known to present a potential risk of attack; and
a primary building element of a Class 1 or 10 building is considered susceptible to termite attack.
For the purposes of (a), a primary building element consisting entirely of, or a combination of, any of the following materials is considered not subject to termite attack:
Steel, aluminium or other metals.
Concrete.
Masonry.
Fibre-reinforced cement.
Timber — naturally termite resistant in accordance with Appendix C of AS 3660.1.
Timber — preservative treated in accordance with Appendix D of AS 3660.1.
State and Territory Variations
In Northern Territory delete 3.1.4.2(b)(v) and replace with the following:
(v) Timber — naturally termite resistant timber in accordance with Appendix C of AS 3660.1 in areas where Mastotermes darwiniensis are not prevalent.
State and Territory Variations
In Queensland delete 3.1.4.2 and replace with the following:
Where a termite management system is required it must—
be selected appropriate to Table 3.1.4.1; and
comply with—
AS 3660.1; or
have been tested and passed the tests required by Section 5 of AS 3660.3; and
have a durable notice installed in accordance with 3.1.4.4; and
where a chemical termite management system is used, the chemical must be included on the appropriate authority's pesticides register.
3.1.4.3(b)(ii) provides the option of having a chemical termite management system tested to AS 3660.3. In order for the test results to remain valid, the system would then have to be installed as tested.
State and Territory Variations
In the Northern Territory delete 3.1.4.3(d) and insert 3.1.4.3(d) and (e) as follows:
include additional termite risk management measures in areas where Mastotermes darwiniensis are prevalent; and
where a chemical termite management system is used—
State and Territory Variations
In Queensland delete 3.1.4.3 and replace with the following:
3.1.4.3 Termite management systems
Where a termite management system is required it must—
A durable notice must be permanently fixed to the building in a prominent location, such as in a meter box or the like, indicating—
the termite management system used; and
the date of installation of the system; and
where a chemical is used, its life expectancy as listed on the appropriate authority's register label; and
the installer's or manufacturer's recommendations for the scope and frequency of future inspections of termite activity.
For the purpose of the pesticides register, the appropriate authority is the government body responsible for the registration of pesticides. Currently, the Australian Pesticides and Veterinary Medicines Authority (APMVA) coordinates the registration scheme.
Where a durable notice is required by 3.1.4.3 a durable notice must be fixed to the building in a prominent location advising the building occupants that the system should be inspected and maintained.
The notice should be clearly written, on a material that will not deteriorate or fade over time and be located in or near the electrical meter box or similar location so that it can be easily seen and read by future owners of the building. Additional information may be included if desired by the person placing the notice.
Building element |
Termite management system or component options |
Concrete slab-on-ground: Slab perimeter or external wall perimeter |
Slab edge exposure Sheet material Granular material Chemical |
Concrete slab-on-ground: Penetrations/control joints/area beneath the slab (see Note) |
Sheet material Granular material Chemical |
Suspended floors |
Sheet material Granular material Chemical |
Attachments to buildings |
Termite management system to the attachment Inspection zone between attachment and building |
Note to Table 3.1.4.1: The entire area beneath the slab must be treated when the slab-on-ground is not designed and constructed in accordance with AS 2870 or AS 3600.
A component of a system as referred to in Table 3.1.4.1 is one that when used in combination with other components, will form a "full system".
For example, if a concrete slab is used as a component of a system, it in itself will not provide a complete termite management system. Depending on the construction methods and the site conditions, additional requirements will be necessary for service penetrations through the concrete slab. Each of these are "components", when integrated, will form a "full system".
There are more than 350 species of termites in Australia, about 30 of which achieve economic importance by causing costly damage to building structures. Due to the nature of termites, it is extremely difficult to prevent them gaining access to a building.
In addition to correct installation of a termite management system, its effectiveness will rely on regular maintenance and competent inspection.
Attachments referred to in Table 3.1.4.1 include downpipes, service pipes, steps, verandahs, porches, access ramps, carports, trellises, decks, heated water systems, airconditioners and the like.
State and Territory Variations
In Queensland delete Table 3.1.4.1 and replace with the following:
Footing system | Slab edge exposure | Termite shielding | Stainless steelmesh | Graded stone | Chemicals |
---|---|---|---|---|---|
Concrete slab-onground complying with AS 2870: Penetrations and control joints | Not suitable | Not suitable | Component; or full system subject to 3.1.4.2(d) | Component; or full system subject to 3.1.4.2(d) | Full system beneath slab subject to 3.1.4.2(d) and (e) |
Concrete slab-onground complying with AS 2870: Slab perimeter | Suitable subject to 3.1.4.2(d) | Not suitable | Component; or full system subject to 3.1.4.2(d) | Component; or full system subject to 3.1.4.2(d) | Perimeter system subject to 3.1.4.2(d) and (f) |
Concrete slab-onground not complying with AS 2870: Beneath slab (includes penetrations and control joints) | Not suitable | Not suitable | Full system subject to 3.1.4.2(d) | Full system subject to 3.1.4.2(d) | Full system beneath slab subject to 3.1.4.2(d) and (e) |
Concrete slab-onground not complying with AS 2870: Slab perimeter | Suitable subject to 3.1.4.2(d) | Not suitable | Full system subject to 3.1.4.2(d) | Full system subject to 3.1.4.2(d) | Perimeter system subject to 3.1.4.2(d) and (f) |
Suspended floors | Not applicable | Suitable subject to 3.1.4.2(d) | Suitable subject to 3.1.4.2(d) | Component; or full system subject to 3.1.4.2(d) | Full system subject to 3.1.4.2(d) and (e) |