NCC 2019 Volume Two Amendment 1
Search the National Construction Code editions
Appropriate Performance Requirements
Where an alternate bushfire protection design is proposed as a Performance Solution to that described in Part 3.10.5, that proposal must comply with—
Performance RequirementP2.7.5 is satisfied for—
a Class 1 building; or
a Class 10a building or deck associated with a Class 1 building,
located in a designated bushfire prone area if it is constructed in accordance with—
AS 3959; or
NASH Standard – Steel Framed Construction in Bushfire Areas.
State and Territory Variations
3.10.5.0 is replaced with the following clause in New South Wales:
Performance RequirementP2.7.5 is satisfied, for—
located in a designated bushfire prone area , if it is constructed in accordance with the following:
AS 3959 except—In New South Wales, buildings subject to BAL-FZ must comply with specific conditions of development consent for construction at this level.
3.10.5.0 is replaced with the following clause in Queensland:
located in a designated bushfire prone area if it is constructed in accordance with—