The distance between the vent of any explosion relief device for a boiler or pressure vessel and any adjacent wall, roof, ceiling or other solid construction shall be calculated in accordance with Table S30C2.
Table S30C2 Minimum clearances for explosion relief
Clearance from
Minimum clearance (metres)
Adjacent wall or ceiling/roof
or 0.4 m, whichever is the greater
Two walls at right angles; or one wall and a ceiling/roof
or 0.6 m, whichever is the greater
Table Notes
is the internal volume of the boiler or pressure vessel being vented up to the connection of the flue.
(1) Floor surfaces beneath boilers and pressure vessels shall be water resistant and formed to drain away from supports and structural building elements.
(2) Where a safe tray is provided to trap liquids, it must be manufactured from a material resistant to corrosion from the contents of the boiler or pressure vessel.